REPAIR OF THE HARBOUR BREAKWATER CROWNWALL PROJECT

About The Project

Location : Misurata - Libya
Duration : 01.2003 – 01.2004
(12 months)
Project Type : Other, Renovation
Status : Completed
Client : Libyan Iron and Steel Company
Contractor: TML Construction Company


It consists of excavation around the conveyor belt column pedestal up to the required depth necessary for maintenance, backfilling, leveling and compacting of the area surrounding each column pedestal, hauling and disposal of damaged concrete and steel reinforcement to the assigned area determined by lisco, electro-mechanical and hand demolition of reinfonced concrete for the damaged breakwater walls, bearing in mind the concrete cover shall be at least 4 cm for the steel reinforcement, electro-mechanical and hand demolition of reinforced concrete for the conveyor belt columns pedestals and prepare and fixing of steel reinforcement to replace the damaged steel bars in addition to the sand blasting or wire brush cleaning for the remaining steel bars as per by standards. The project has been accomplished by system management as individually.

Image

Image

Image

Image